An Analysis of Project Risk Management and Contributing Factors

Authors

  • Muhammad Abbas Institute of Business Management, Karachi Pakistan
  • Hina Aziz National University of Science and Technology, Islamabad
  • Sadaf Munir National University of Science and Technology, Islamabad
  • Asim Iftikhar Institute of Business Management, Karachi Pakistan
  • Muhammad Asghar Khan Institute of Business Management, Karachi Pakistan

Keywords:

Project Risk Management, Conflict Management, Risk factors, Project Management Knowledge Areas

Abstract

To achieve successful outcomes, project managers must effectively resolve conflict situations during project management. In this study, we focus on developing a systemic approach to conflict management in project risk management and analyzing various factors contributing to conflict situations.  Using a structured questionnaire, we collected data from 200 risk analysts working in the software industry under the project management domain. The data were analyzed using probabilistic methods and statistical analysis to develop a systemic approach to conflict management. The questionnaire was designed to capture information on various factors that contribute to conflicts during project risk management, including the extent of exposure and multiple exposures. The study's findings reveal that a systemic approach to conflict management in project risk management is effective in minimizing the negative impacts of conflicts. Our analysis identified several contributing factors to conflicts, including poor communication, insufficient risk assessment, and unclear project goals. We propose a systemic approach to conflict management that involves identifying the contributing factors, assessing their severity, and developing appropriate conflict management strategies. The study's contributions include developing a systemic approach to conflict management in project risk management, identifying contributing factors to conflicts, and proposing effective conflict management strategies. The research findings have important implications for project managers who want to achieve good project results while avoiding the negative effects of conflict.

References

G. A. Zsidisin, L. M. Ellram, J. R. Carter, and J. L. Cavinato, “An analysis of supply risk assessment techniques,” Int. J. Phys. Distrib. Logist. Manag., vol. 34, no. 5, pp. 397–413, 2004.

B. Hysa and S. Spalek, “Opportunities and threats presented by social media in project management,” Heliyon, vol. 5, no. 4, p. e01488, 2019.

V. Hosseinpour, A. Saeidi, M.-J. Nollet, and M. Nastev, “Seismic loss estimation software: A comprehensive review of risk assessment steps, software development, and limitations,” Eng. Struct., vol. 232, p. 111866, 2021.

A. Iftikhar, S. M. Ali, M. Alam, S. Musa, and M. M. Su’ud, “Analysis of Risk Factors in Global Software Development: A Cross-Continental Study Using Modified Firefly Algorithm,” Comput. Intell. Neurosci., vol. 2022, 2022.

A. Iftikhar, M. Alam, R. Ahmed, S. Musa, and M. M. Su’ud, “Risk Prediction by Using Artificial Neural Network in Global Software Development,” Comput. Intell. Neurosci., vol. 2021, 2021.

V. K. Verma, “Conflict management,” Proj. Manag. Inst. Proj. Manag. Handb., pp. 353–364, 1998.

“[3] How to complete a risk assessment, Bernie Eccles and Professor Ian Bruce OBE - Google Search.” https://www.google.com/search?q=%5B3%5D%09How+to+complete+a+risk+assessment%2C+Bernie+Eccles+and+Professor+Ian+Bruce+OBE&sxsrf=APwXEdfm5xWfWihRDNxDll_0X4OBcn9TSQ%3A1680824397288&ei=TVgvZJqXEfqX9u8Plbi3-Ac&ved=0ahUKEwja8YTptpb-AhX6i_0HHRXcDX8Q4dUDCA8&uact=5&oq=%5B3%5D%09How+to+complete+a+risk+assessment%2C+Bernie+Eccles+and+Professor+Ian+Bruce+OBE&gs_lcp=Cgxnd3Mtd2l6LXNlcnAQAzoKCAAQRxDWBBCwAzoKCAAQigUQsAMQQ0oECEEYAFDXnQFY150BYI6rAWgEcAF4AIAB6QGIAekBkgEDMi0xmAEAoAECoAEByAEJwAEB&sclient=gws-wiz-serp (accessed Apr. 07, 2023).

H. Barki, S. Rivard, and J. Talbot, “Toward an assessment of software development risk,” J. Manag. Inf. Syst., vol. 10, no. 2, pp. 203–225, 1993.

A. Iftikhar, S. Musa, M. Alam, and M. M. Su’ud, “Artificial Intelligence Based Risk Management in Global Software Development: A Proposed Architecture to Reduce Risk by Using Time, Budget and Resources Constraints,” J. Comput. Theor. Nanosci., vol. 17, no. 2–3, pp. 878–885, 2020.

A. Iftikhar et al., “Risk Classification in Global Software Development Using a Machine Learning Approach: A Result Comparison of Support Vector Machine and K-Nearest Neighbor Algorithms,” J. Inf. Technol. Res. JITR, vol. 15, no. 1, pp. 1–21, 2022.

Z. Shapira, Risk-taking: A managerial perspective. Russell Sage Foundation, 1995.

M. N. Faisal, “Prioritization of risks in supply chains,” Manag. Supply Chain Risk Vulnerability Tools Methods Supply Chain Decis. Mak., pp. 41–66, 2009.

L. R. Smeltzer and S. P. Siferd, “Proactive supply management: the management of risk,” Int. J. Purch. Mater. Manag., vol. 34, no. 4, pp. 38–45, 1998.

J. J. Jiang, G. Klein, and T. L. Means, “Project risk impact on software development team performance,” Proj. Manag. J., vol. 31, no. 4, pp. 19–26, 2000.

B. G. Tavares, M. Keil, C. E. Sanches da Silva, and A. D. de Souza, “A risk management tool for agile software development,” J. Comput. Inf. Syst., vol. 61, no. 6, pp. 561–570, 2021.

B. G. Tavares, C. E. S. da Silva, and A. D. de Souza, “Risk management analysis in Scrum software projects,” Int. Trans. Oper. Res., vol. 26, no. 5, pp. 1884–1905, 2019.

T. Hussain, “Risk management in software engineering: What still needs to be done,” in Intelligent Computing: Proceedings of the 2018 Computing Conference, Volume 2, Springer, 2019, pp. 515–526.

S. Santos, F. Carvalho, Y. Costa, D. Viana, and L. Rivero, “Risking: A game for teaching risk management in software projects,” in Proceedings of the xviii brazilian symposium on software quality, 2019, pp. 188–197.

Y. Fu, M. Li, and F. Chen, “Impact propagation and risk assessment of requirement changes for software development projects based on design structure matrix,” Int. J. Proj. Manag., vol. 30, no. 3, pp. 363–373, 2012.

T. Raz and E. Michael, “Use and benefits of tools for project risk management,” Int. J. Proj. Manag., vol. 19, no. 1, pp. 9–17, 2001.

A. Nieto-Morote and F. Ruz-Vila, “A fuzzy approach to construction project risk assessment,” Int. J. Proj. Manag., vol. 29, no. 2, pp. 220–231, 2011.

H. Aziz, S. Munir, and M. Sufian, “Conflict handling in project management: A risk assessment analysis,” in 2018 12th International Conference on Mathematics, Actuarial Science, Computer Science and Statistics (MACS), IEEE, 2018, pp. 1–7.

D. Gotterbarn and S. Rogerson, “Responsible risk assessment with software development: creating the software development impact statement,” Commun. Assoc. Inf. Syst., vol. 15, no. 1, p. 40, 2005.

K. Kansala, “Integrating risk assessment with cost estimation,” IEEE Softw., vol. 14, no. 3, pp. 61–67, 1997.

P. Ramachandra, H.-K. Kim, B. Kang, Y. Ha, and R. Lee, “Risk Management through Architecture Design,” in Fourth International Conference on Software Engineering Research, Management, and Applications (SERA’06), IEEE, 2006, pp. 386–395.

S. P. Robbins, Managing organizational conflict: A nontraditional approach. Englewood Cliffs: NJ, Prentice-Hall, 1974.

Downloads

Published

2023-07-10